A 3D model created using computer-generated imagery software shows how a 2,050-tonne tunnel boring machine (TBM) broke through into an underground reception can. This was then filled with foam concrete and the 4,217th concrete tunnel ring installed to complete the 8km stretch of Northolt Tunnel in London.
View the original article and our Inspiration here
Leave a Reply