Concrete curing tends to get pushed down the list of priorities on the jobsite. It doesn’t have the same immediate visual payoff as placing and finishing. Add this to budget constraints and tight project timelines, and it’s easy to see why curing in the field is often messy and improvised — even sometimes altogether overlooked.
Construction culture should start to treat the curing of concrete as a priority, not an afterthought. Proper curing is essential for sound, durable concrete. Improperly cured concrete will have low strength and poor durability among other deficiencies. Taking the time and effort for proper curing preserves the integrity of a well-designed mix. It prevents costly rework, failed inspections, and liability issues down the road.
The Critical Window Between Finishing & Curing
If moisture begins flashing off before troweling is finished, the damage has already started.
All concrete should be cured. Curing promotes the hydration of the concrete which is the chemical reaction between cement and water that causes concrete to harden and gain strength. This reaction occurs as soon as these two materials come into contact and continues at a steadily reducing rate for months and, in some cases, even years under ideal conditions. In the fast-paced schedules of today’s modern construction proper curing of concrete is still a critical step.
Curing should begin as soon as finishing operations are complete — but that timing isn’t always straightforward. Finishing may stretch out due to several factors, including excessive bleed water, shifting weather, or construction delays, making the determination to the start of curing more complex than simply checking a box. For example, if moisture begins flashing off before troweling is finished, the damage has already started.
Keep finishing tools available, but stage curing blankets, plastic or sprayers nearby and ready for immediate use. Even a short delay (an hour or less) in hot or windy conditions can result in early surface damage that’s difficult to reverse.
Curing Method Considerations
The greatest risk often isn’t extreme temperature, but fluctuation.
Moisture Retention: The simplest description of curing concrete is moisture retention for hydration. While most understand the need for moisture retention, not all curing methods are equally practical or effective in every situation. Spray-applied compounds or liquid membranes are efficient but only work when applied at the correct rates and when proper application techniques are used. Plastic sheeting is affordable and effective but can blow off or trap bleed water. Burlap and water methods are reliable but require consistent monitoring and rewetting.
Choose the right method based on the project pace, weather conditions, and available crew capacity. Assigning curing isn’t enough, someone should also be tasked with verifying that the method in use continues to function, particularly on days two and three, when focus tends to shift to the next phase of work.
Temperature Control: Temperature control is another area where the basics are widely known — maintaining a range between 50 and 85° F — but applying that knowledge is more nuanced. Warm days followed by cold nights call for insulated blankets. Pours scheduled during 90° F heat with low humidity demand misting or retarders to slow evaporation.
Remember, the greatest risk often isn’t extreme temperature, but fluctuation. Success depends on ongoing monitoring to ensure slabs remain in the target range for several days not just a few hours.
Duration: Curing is frequently cut short once early strength gain appears satisfactory. However, the purpose of curing goes beyond compressive strength. It includes minimizing permeability, cracking, and long-term performance issues.
Even when early breaks meet target values, premature termination of curing can still lead to durability problems and callbacks later. Meeting the spec isn’t the goal; achieving lasting, resilient concrete is.
More about curing on ForConstructionPros.comThe How’s and Why’s of Concrete Curing – Discover ways concrete petrographers evaluate how well (or not) curing operations are done in concrete construction. Does Cold Curing Water Cause Concrete Surfaces to Crack? – If the curing water wasn’t heated, would the concrete crack? Curing Part I – Why cure? – Curing is a critical concreting step and significantly influences the properties of the hardened concrete at depth and at the top and near surface including strength, permeability, abrasion resistance, shrinkage, resistance to freezing and thawing and deicing chemicals. |
Preventing Premature Loading & Foot Traffic
Protecting concrete during curing can be more challenging than the curing process itself. Premature loading, intentional or not, remains one of the top causes of surface failures, even when curing is otherwise adequate.
Visual warnings such as caution tape and signs are useful, but insufficient on their own. Cones, fencing, and clear communication across all trades help prevent accidental traffic. A designated person should manage access, and daily job briefings should include instructions on protection timelines.
Watch For & Act on Early Warning Signs
Linking curing responsibilities to daily QC checklists with sign-off from both foremen and site superintendents creates a documented paper trail.
Early signs of curing problems, such as dusting, crazing (also known as map cracking), curling edges, or a lack of surface sheen, often appear in time to allow for process adjustments. The key is rapid recognition and response, whether that means reapplying compound, reinforcing moisture retention, or extending the curing period. At that point, the process shifts from curing to recovery. Avoiding that transition depends on vigilance from the start.
Overcoming Timeline & Budget Challenges
Don’t let curing get pushed aside to meet tight deadlines. The best way to avoid this is to treat curing like any other critical step: build at least seven days for it into the schedule and make sure everyone knows it’s not optional. If appropriate, use low-maintenance methods like spray-on curing compounds or curing blankets that won’t slow down other work. If possible, schedule pours during cooler times of day, or at night to reduce curing headaches. Lastly, assign someone on site to keep an eye on the curing process every day, ready to adjust if conditions change.
Budget pressures don’t have to mean poor curing. Economical materials like plastic sheeting work just fine to hold moisture in. Water misting with a simple garden sprayer is an easy, low-cost way to keep things damp. When water is scarce, use affordable curing compounds sprayed on once to seal moisture in.
Keeping curing on track in busy or complex projects requires clear communication and accountability. Enforce responsibility and accountability. Incorporate curing into daily checklists and quality control plans to make it part of the routine. And regular toolbox talks can reinforce the importance of curing across all crews.
When accountability lapses, opt for stronger enforcement. Linking curing responsibilities to daily QC checklists with sign-off from both foremen and site superintendents creates a documented paper trail. If problems persist, escalation through RFIs or corrective action reports formalizes non-compliance. Pre-pour meetings can also help clarify who is monitoring curing on any given day. Naming a point person, tracking performance, and documenting follow-through help eliminate the common “someone else was handling it” gap in responsibility.
View the original article and our Inspiration here