Category: Temporary structures
-
Balfour uses temporary structure during medieval bridge refurb
Russell Ward, major projects sales manager at Mabey Hire, added: “Space was extremely limited on site, with existing buildings in close proximity, as well as footpaths and other furniture on both banks. All of this meant that we only had a very small footprint in which to assemble and manoeuvre the bridge. View the original…