Tag: Farrans
-
How can we eliminate plastic waste from construction sites?
During plastic audits, sock pipe coverings had been identified as a single use plastic waste stream. NI Water and Farrans Glanua identified hard, recyclable covers which could be washed and reused instead. These recyclable end caps are now used on the trunk main framework, contributing towards Farrans’ zero plastic to landfill objective. View the original…
-
Digital Construction Awards 2025: Digital Construction Project of the Year shortlist
The Digital Construction Awards attracted 170-plus entries this year, 85 of which have been shortlisted. Here, we detail the finalists for the Digital Construction Project of the Year award. 40 Charter Street, Canary Wharf | KPF/Canary Wharf Group/Aecom/Revizto/Dome Group/Disperse 40 Charter Street at Wood Wharf (Image: Canary Wharf Group) 40 Charter Street is a 52-storey,…
-
Farrans flies high with airport expansion
Main contractor: FarransClient: Leeds Bradford AirportArchitect: Millar Design + ManagementStructural engineer: Dudleys Consulting EngineersSteelwork contractor: Elland Steel StructuresValue: £100m (two phases)Start date: April 2024Completion (phase one): summer 2025Completion (phase two): winter 20 View the original article and our Inspiration here